• Home
  • Blogs
    • Daily Blog
    • Marie’s Blog
    • Bob’s blog
  • Solar Data
  • Temperature Log
  • Gallery
  • Virtual Earthship
  • Resources
  • Contact Us
Search the site...
  • Home
  • Construction
  • Construction Year 1 – 2012

Construction Year 1 – 2012

March 28, 2013 / blevac / Construction
0
Earthship Layout
Permit!!
Civic Address
Breaking Ground
Septic Tank Hole
Septic Delivery
Septic Tank in Ground
Septic Tank Buried
Start-of-excavation
Top Soil Removal
Fill
Leveling
More Leveling
Completed Building Platform
View from Driveway
Hybrid
Tire Pile
Tire Collection
Roof Beams

 

Share this:

  • Share
  • Share on Facebook (Opens in new window) Facebook
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Share on X (Opens in new window) X
  • Email a link to a friend (Opens in new window) Email
  • Share on Tumblr (Opens in new window) Tumblr
  • Share on Reddit (Opens in new window) Reddit

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

 

Current Temperature

Image Galleries

Downpour Tire Delivery 2 Wicking Beds Tires Stored for Winter Porch Enclosed Porch Framing

Search

(c) 2019 GL Earthship